VWS Beijing proposed upgrading works and modifications to the existing plant and the provision of the 140,000 m3/d extension, to meet the water quality requirements.
The new wastewater treatment plant process include a pre-treatment (coarse screen, fine screen, grit and grease removal), Multiflo® settlers for primary treatment, Biostyr® biofilters for biological treatment, mesophilic anaerobic digestion and centrifugation dewatering for sludge treatment, UV for disinfection and Alizair® for odour treatment.
The selected secondary treatment, Biostyr® is a biofiltration system, using an aerated fixed bed reactor for biofilm attachment and solids retention, achieving simultaneously the nitrification and denitrification of the ammonia, and the filtration of water. The Biostyr® process consists of an upflow filtration, co-current with process air, through a submerged and floating fine granular media.
VWS Beijing chose to propose a secondary treatment by Biostyr® Biological Aerated Filter:
- Suitable for the local context in terms of land constrain and loads/flow to be treated,
- Answering the performances required in terms of water quality of the discharge and odour reduction
- Looking for the environment protection in the context of the Chinese strategy for water pollution prevention and treatment