ACTIFLO® is the best solution proposed by OTV for this project.
The refurbishment of the settling stage is in one complete existing drinking water plant, all the existing structure up and down steam have to be considered in new technical process. ACTIFLO® could fulfill the requirements all existing real situation, such as the samll foot print, the variation raw water quality from now to future, algae removal, the strict requirement of effluent quality, less change of existing process structure and ability for future extension of the capacity.
The refurbishment project was signed in November 2004 and completed in August 2005, as the predicted result, establishing sound foundation for the safety and high quality of municipal water supply.